Microsoft Azure
Azure Cloud
Accelerate your journey to the cloud with a complete strategy for migration, architecture, and infrastructure management on Microsoft Azure. We deliver end-to-end services that ensure security, scalability, and cost optimization for your cloud operations.
Request a proposalScope of Services
Cloud Assessment
In-depth analysis of your current environment, dependency mapping, TCO/ROI cost evaluation, and a migration roadmap.
Workload Migration
Lift-and-shift migration, re-platforming, and application modernization using Azure Migrate, Database Migration Service, and specialized tooling.
Cloud-Native Architecture
Design and implementation of solutions built on Azure Kubernetes Service (AKS), Azure Functions, App Services, containers, and microservices.
Infrastructure as Code
Automation with Terraform, Bicep, and ARM Templates for consistent, version-controlled deployments.
FinOps and Optimization
Cost governance, rightsizing, Reserved Instances, Savings Plans, and adoption of FinOps practices.
Security and Compliance
Microsoft Defender for Cloud, Azure Policy, compliance blueprints (LGPD, ISO 27001, SOC 2), and Zero Trust Architecture.
Business Benefits
- Average 30-40% reduction in infrastructure costs
- No more spending on obsolete hardware
- On-demand scalability to support growth
- High availability with SLAs of up to 99.99%
- Agility to launch new products and services
Methodology
We use the Microsoft Cloud Adoption Framework (CAF) as our methodological foundation, structuring the journey into Strategy, Plan, Ready, Migrate, and Govern phases. Every project includes a well-architected landing zone, migration with minimal downtime, and knowledge transfer to your team.
When Migrating to Azure Makes Sense
The decision to migrate rarely starts with the technology itself. It is usually triggered by a concrete event: servers reaching the end of their warranty, a data center contract coming up for renewal, versions of Windows Server or SQL Server approaching end of support, the need for a disaster recovery plan, or growth that the current infrastructure cannot absorb. These moments are good opportunities because the investment would have to be made anyway, and the cloud becomes an alternative worth comparing.
Not every workload needs to move to the cloud, and not all of them should move the same way. Systems that depend heavily on local equipment, require very low latency, or have restrictive licensing can remain on-premises in a hybrid model. Others gain more from being modernized than from simply being moved as they are. Serious Azure consulting starts with that inventory: what exists, what it depends on, how much it consumes, and which destination suits each application, with a realistic cost estimate.
Landing Zone and Governance: The Foundation Before the First Workload
The landing zone is the environment prepared to receive workloads. It defines how subscriptions are organized, how the network connects to the on-premises environment, who can do what, which policies are mandatory, and where activity logs are sent. Building it before the migration avoids the most common scenario in environments that grew without planning: scattered resources, broad permissions, networks with no segmentation, and no standard for names or tags.
In practice, governance relies on a few mechanisms used well. Management groups and subscriptions separate environments and business areas. Role-based access control limits permissions to what is necessary, with identities managed in Microsoft Entra ID. Azure Policy blocks or flags nonstandard configurations, such as resources in unauthorized regions or without mandatory tags. And infrastructure as code ensures that the environment can be reproduced and audited instead of depending on manual settings made in the portal.
Costs, Security, and Operations After the Migration
The pay-as-you-go model changes how the infrastructure budget is managed. Without oversight, oversized machines, unused disks, and test environments left running around the clock show up on the invoice. FinOps practice organizes this control: tags that assign each resource to a department or project, budgets and alerts in Microsoft Cost Management, periodic rightsizing reviews, and reservations or savings plans for stable workloads. Companies with eligible licenses can also take advantage of Azure Hybrid Benefit.
Security follows the shared responsibility model: Microsoft protects the cloud infrastructure, and the customer is responsible for identities, configurations, data, and access. That means protecting administrative accounts, segmenting networks, keeping tested backups, and following up on the recommendations from Microsoft Defender for Cloud. Operations continue after the migration, with monitoring, patching, restore tests, and cost reviews. Deciding who will do this work, the in-house team or a partner, is part of the planning from the very beginning.
Frequently Asked Questions About Azure Consulting
What does an Azure consulting firm do?
It supports the company through the entire cloud adoption cycle: assessing the current environment, estimating costs, designing the architecture and the landing zone, carrying out the migration, and structuring governance and operations. It also works on environments that are already in Azure and need a review of costs, security, or architecture. Value iT is a Microsoft Partner, was founded in 2012, and has delivered more than 750 projects.
How much does it cost to migrate to Azure?
It depends on what will be migrated and how. The cost has two parts: the migration project and the monthly consumption of resources, which varies with sizing, region, purchasing model, and the use of existing licenses. That is why the assessment stage is essential: it inventories the workloads, measures actual usage, and produces a well-founded estimate that can be compared with the cost of keeping the current environment.
Do I need to migrate all my servers at once?
No. The most common approach is to migrate in waves, starting with lower-risk workloads, and to keep a hybrid environment for as long as necessary, with connectivity between the local network and Azure. Some applications may stay on-premises permanently for technical or licensing reasons. The migration plan defines the order, the dependencies between systems, and the change windows, so that each stage is validated before the next one begins.
Can the data be stored in Brazil?
Azure has a region in Brazil, and the customer chooses the region in which each resource is created. The choice takes into account latency, data residency requirements, availability of the desired services, and cost, which varies between regions. Governance policies can restrict resource creation to the regions authorized by the company. In projects with regulatory requirements, this point is handled in the architecture phase, with the legal and security teams involved.
How do I keep the Azure bill from getting out of control?
With visibility and clear ownership from day one. Mandatory tags show how much each department or system consumes, budgets and alerts warn about deviations, and periodic reviews identify idle or oversized resources. For stable workloads, reservations and savings plans lower the price in exchange for a usage commitment. Policies can also limit the types of resources each team is allowed to create.
Does Value iT operate the environment after the migration?
Post-migration operations are part of project planning. Depending on what is agreed, Value iT can support monitoring, update and backup management, cost reviews, and the evolution of the architecture, or prepare the in-house team to take over these routines, with documentation and knowledge transfer. The scope of support is defined case by case, according to how critical the environment is.
Related Content
Request a proposal
Tell us what you need. A Value iT specialist will get back to you.
Azure Cloud